Search properties

Search properties

Memoria de calidades

  1. GENERAL CHARACTERISTICS
    Self-supporting independent estructural module The interior free height of the rooms will be 2600 mm. The facilities are complete and its distribution is reflected in the plans. The total exterior dimensions are 12.00m x 2.50m.
  2. FOUNDATION
    Existing
  3. METAL STRUCTURE
    Original maritime container structure.
  4. FINISHING FLOORS
    Wooden floor, parquet or floating floor. May be other upon client decision.
  5. COVER CLOSURE
    Flat metal cover.
  6. PERIMETER CLOSURE
    Metal side walls of the maritime container.
    6.1. INTERIOR FINISHES
    White Plasterboard or similar.
  7. INTERIOR DIVISIONS
    White plasterboard or similar.
  8. FALSE CEILINGS
    Plasterboard, air chamber and thermal / rock wool acoustic insulation.
  9. FACADE / OUTSIDE CARPENTRY
    At the customer’s choice within a medium range.
  10. INTERIOR CARPENTRY
    At the customer’s choice within a medium range.
  1. ELECTRICAL INSTALLATION
    Complete chord plans by common agreement.
  2. PLUMBING INSTALLATION
    Complete chord plans by common agreement.
  3. AIR CONDITIONING SYSTEM
    Includes a cold / heat air conditioning equipment of 3,000 fr / Kcal-Split.
  4. SOLAR ENERGY INSTALLATION
    To budget separately if requested.
  5. SCOPE OF OUR OFFER
    In our prices are included, in addition to the indicated, any concept of diets, salaries and social insurance, leaving the client exempt from any subsidiary responsibility.
  6. EXCLUSIONS
    Fees, visas and taxes related to licenses or permits.
    Light and water on site.
    Water, electricity, sanitation, telephone connections. Rubble container.
    Works in urbanization. Needed foundations.
    Furniture of all units, Appliances not specified in this offer.
    Fire detection, home automation and security installation.
    Any aditional item or work not offered in this budget.
  7. DEADLINES
    12 weeks from the signing of the contract and payment of the advance.
  8. PAYMENT METHOD
    Advance 50%.
    At the end of production 30%.
    Balance upon delivery and final assembly (20%).